This intake captures everything we need to configure, calibrate, and deploy your five-agent Flex Industrial Intelligence platform. Your answers directly determine how each agent operates โ scoring thresholds, geographic targets, deal criteria, outreach preferences, and dashboard layout. Estimated time: 25โ35 minutes.
5
Agents
70
Questions
35
Min Est.
48hr
Blueprint
Why this matters: Every answer here maps directly to an agent configuration parameter. The more detail you provide, the more accurately the agents perform from Day 1. Incomplete answers mean more calibration time during Week 2 shadow mode.
Your Information
Who Is Filling This Out
Your configuration report will be sent to the email address below.
You will receive a complete copy of your submitted answers at this address.
02 โ Company Profile
Synergy Development Overview
Basic information about your organization, team structure, and current operations.
Organization
Company & Team
Help us understand who's operating the platform day-to-day.
Name and role of the person logging into the dashboard daily.
List additional users and their roles (e.g., analyst, partner, admin).
Just me
2โ3 people
4โ6 people
7+ people
Under 10 hours
10โ20 hours
20โ40 hours
40+ hours
03 โ Acquisition Strategy
Deal Criteria & Targets
These answers configure the scoring engine that determines which deals surface to your dashboard and which get filtered out.
Geography
Target Markets
Select your launch states and priority MSAs.
The build spec lists UT, NV, ID, CO, AZ. Confirm or modify.
Utah
Nevada
Idaho
Colorado
Arizona
Oregon
Washington
Montana
Wyoming
New Mexico
Texas
e.g., Salt Lake City, Boise, Phoenix, Denver, Las Vegas. List in order of priority.
Specific cities, counties, or areas you don't want the agents scanning.
Deal Parameters
Acquisition Criteria
These directly configure the scoring thresholds for all 5 agents.
Drag to reorder or just number them 1-3.
Category A โ Distressed Buildings
Category B โ NPL / Defaulted Loans
Category C โ Development Land
Minimum ($)
Maximum ($)
Minimum sq ft
Maximum sq ft
Minimum acres
Maximum acres
Minimum cap rate (%)
Target cap rate (%)
Build spec says 20โ40% below replacement. Confirm or adjust.
20%+ below replacement
30%+ below replacement
40%+ below replacement
Custom threshold
Build spec says 55โ70ยข per $1 UPB. Confirm or adjust.
50โ60ยข per $1 UPB
55โ70ยข per $1 UPB
60โ75ยข per $1 UPB
Custom range
Build spec says 30โ50% below land comps. Confirm or adjust.
30%+ below comps
40%+ below comps
50%+ below comps
Custom threshold
Select all that apply.
I-1 (Light Industrial)
I-2 (Heavy Industrial)
Flex / Mixed-Use Industrial
M-1 (Manufacturing)
Commercial with industrial conversion potential
Unzoned / Agricultural with rezone potential
e.g., environmental contamination, flood zone, specific tenants, title issues.
Occupied (cash flowing)
Vacant (value-add / reposition)
Both โ depends on price
Built after 2000 only
Built after 1990
Built after 1980
Any age if structure is sound
Standard flex industrial is 16-24 ft. This filters out buildings that don't meet tenant requirements.
No preference
16 ft minimum
20 ft minimum
24 ft minimum
Required โ dock high
Required โ grade level / drive-in
Either type acceptable
No requirement
04 โ Scout Agent Configuration
Market Surveillance Preferences
Configure how the Scout Agent scans, filters, and prioritizes leads across your target markets.
Agent 01 โ Scout
Data Sources & Scanning
Select all that apply. The agent will monitor all of these automatically.
LoopNet
CREXi
Ten-X
Bid4Assets
MLS Commercial
Auction.com
CoStar (if you have access)
Other
Yes โ systematically
Occasionally / informally
No โ want the agent to handle this
This configures the Scout Agent's scan frequency.
Real-time (every 2 hours)
Twice daily
Daily overnight batch
Lower = more leads but more noise. Higher = fewer leads but higher quality. Recommend starting at 60.
e.g., proximity to interstate, days on market, price reduction history, distress signals.
e.g., LoopNet saved searches, CREXi alerts, CoStar filters. Share the criteria and we'll configure the Scout Agent to match.
Some counties have great online records, others are paper-only. Tell us which counties you've worked in so we prioritize those integrations first.
05 โ Underwriting Agent Configuration
Financial Analysis Preferences
Configure how the Underwriting Agent evaluates deals and what financial metrics matter most to your investment thesis.
Submit your answers and we'll deliver a finalized agent configuration document within 48 hours โ mapped directly to these responses.
Your answers are encrypted and sent directly to the TFSF Ventures build team.
โ
Intake Received
Your configuration answers have been submitted to the TFSF Ventures build team. You'll receive a finalized agent configuration document within 48 hours. Build kickoff: April 9, 2026.